Tear-Off vs Roof-Over
| Full tear-off | Roof-over (layover) |
|---|
| Decking inspected | Yes, every sheet | No, it stays hidden |
| Rotted decking replaced | Yes | No |
| New underlayment and ice and water shield | Yes | Limited or none |
| New flashing | Yes | Often reused |
| Weight on the structure | One layer | Two layers |
| Roof lifespan | Full lifespan | Often shorter |
| Manufacturer warranty | Full coverage | May be limited |
| Upfront cost | Higher | Lower |
Why EPHI Tears Off Every Roof
Every roof EPHI replaces is a full tear-off. It’s the only way to see the decking, replace what’s damaged, and build the roof correctly from the deck up, with new synthetic underlayment, new ice and water shield, new drip edge, new step flashing and new pipe boots. It’s also how we can stand behind the roof with the EP Protection Plan™ for as long as you own the home. Related: roof underlayment, roof flashing.
What Happens on Tear-Off Day
- Protect the property: tarps go over landscaping, and the work area is set up.
- Tear off in sections: crews only remove what can be dried in the same day. Your roof is never left open overnight, and tarps stay on site for weather.
- Inspect the decking: every sheet is checked once the old roofing is off.
- Replace damaged decking: we photograph it, show you, and replace it through a change order. Per-sheet decking pricing is listed up front in your EP SmartQuote+™.
- Dry in: ice and water shield and underlayment go down the same day.
- Install the new roof: flashing, shingles, ventilation and ridge.
- Clean up: crews clean up daily, sweep the yard and driveway with a magnet for nails, and finish with a full cleanup and final walkthrough with you.
You can follow along with job photos through EP Project Cam.
How Long Does a Roof Take?
Roofs are measured in squares (one square is 100 square feet). Typical timelines:
| Roof size | Typical time |
|---|
| 10–15 squares | About 1 day |
| 15–25 squares | About 2 days |
| 25–35 squares | About 3–4 days |
These are estimates. The actual time depends on how steep and complex the roof is, how many layers are coming off, and the weather.
What Is Roof Decking?
Decking is the plywood or OSB sheathing the shingles are nailed to. Leaks, poor ventilation and age can rot or soften it. You can’t see bad decking until the old roof comes off, which is one more reason a roof-over is a gamble. See roof lifespan.
EPHI Roofing
Shingle packages run from EP RidgeLine™ (Good), EP StormLine™ (Better) and EP ImpactLine™ (Best) to EP ImpactLine Premier™ (Premier), with EP MetalSeries™ metal also available. EPHI is a GAF Master Elite contractor, and we pull the permit when one is required. See our roofing page.
Get Roof Pricing
In a hurry, away on vacation, or not up for a visit? Ask for an EP Aerial Quote™ and we’ll price your roof without coming to your home.
Or price your roof with EP SmartQuote+™, schedule a free estimate, or call (989) 833-1000.